2011 Spring/Summer Projects

2011 Spring/Summer Projects

(current as of 12/20/10)

STRUCTURES

  • Campus wide - repair trip hazards.

HVAC

  • Internal Audit- install new register / damper control systems for PAC-3
  • Finance Center- 2nd floor HVAC system zoning upgrade. Install (3) 18 SEER condensing units 90+ AFUE furnaces, new ducting and insulate attic
  • Eberhardt School of Business- Honeywell Spyder - Bacnet E.M.S. system upgrade for chiller / boiler rooms

PLUMBING

  • Campus wide- testing of back-flow devices
  • Residence Halls - installation of fire sprinkler systems in housing areas to be determined
  • Campus Wide- underground gas survey and repairs of any leaks found
  • Campus Wide- annual testing of back-flow devices
  • SOP Boiler Room - change out water heater to new high efficient unit
  • Presidents Residence - change out sewer line

GROUNDS

  • Campus wide - weed control, fertilizing and seeding
  • South Campus Gym - build a new trash enclosure on the east side of the old gym.
  • Campus wide - fill in plantings
  • Campus wide - assist with contractors
  • Campus wide - inputting data into IMMS- Irrigation Monitoring Management Systems.
  • Campus wide - improve existing landscapes

 

  • Upgrade and repair chlorinator at river pumps
  • University Center - replace decomposed granite and fire lane turf cell
  • Conservatory of Music Concert Hall -ADA upgrade mid May to July
  • Pharmacy - replace B-Wing flooring, replace stair treads on all four staircases to basement - August